Projects · Sheet P-01

Finished work, and the work between.

Completed builds from two generations of Auld family building, and the site diary that shows how they actually got there.

01 · Completed

The Bronte house.

Stephen J. Auld's $4M+ design and construct in Bronte won the MBA NSW Excellence in Building Award 2019, Housing (Residential), Design & Construct. Curved off-form concrete, timber joinery, built to last. The same standard runs through every Tillow Built project today.

The award-winning Bronte residence at dusk, curved off-form concrete with lit balconies
BRONTE · MBA NSW EXCELLENCE IN BUILDING, WINNER 2019
Dining room, timber joinery and off-form concrete, Bronte award house
DINING ROOM, TIMBER JOINERY AND OFF-FORM CONCRETE
Floating timber stair, Bronte award house
FLOATING TIMBER STAIR
Timber and steel kitchen, Bronte award house
TIMBER AND STEEL KITCHEN
Lap pool beside curved concrete balconies, Bronte award house
LAP POOL BESIDE CURVED CONCRETE BALCONIES

The drawings

Stamped development-approval elevations, north and east, for the Bronte house at 27 Evans Street
DA ELEVATIONS, NORTH & EAST · 27 EVANS ST, BRONTE
Stamped development-approval elevations, south and west, for the Bronte house at 27 Evans Street
DA ELEVATIONS, SOUTH & WEST · 27 EVANS ST, BRONTE

These are the stamped drawings for that build. For Stephen, the Bronte house brought four decades on the tools into a single residence, the one the MBA NSW judges singled out for its design, execution and precision in 2019. Hubert grew up on this site. The standard set here is the standard Tillow Built is measured against today.

02 · Completed

Decks, terraces and joinery.

Tillow Built work across Sydney: hardwood decks, rooftop terraces, privacy screens and interior carpentry, photographed on handover.

Rooftop terrace, harbour view, completed by Tillow Built
ROOFTOP TERRACE, HARBOUR VIEW
Backyard deck, pool and glass fence, completed by Tillow Built
BACKYARD DECK, POOL AND GLASS FENCE
Deck with glass balustrade, water view, completed by Tillow Built
DECK WITH GLASS BALUSTRADE, WATER VIEW
Courtyard timber deck, completed by Tillow Built
COURTYARD TIMBER DECK
Timber deck around a dragon tree, completed by Tillow Built
TIMBER DECK AROUND A DRAGON TREE
Timber slat privacy screen, completed by Tillow Built
TIMBER SLAT PRIVACY SCREEN
Interior timber feature wall, completed by Tillow Built
INTERIOR TIMBER FEATURE WALL
Hallway timber feature wall, completed by Tillow Built
HALLWAY TIMBER FEATURE WALL

03 · Heritage

Annecy lakehouse, France.

Piper Moss heritage work: a lakeside attic conversion with exposed trusses and hand-set timber, on Lake Annecy.

Attic bedroom with exposed timber trusses, Annecy lakehouse
ATTIC BEDROOM WITH EXPOSED TIMBER TRUSSES
Freestanding bath with lake and mountain view, Annecy lakehouse
FREESTANDING BATH WITH LAKE AND MOUNTAIN VIEW
Sitting area under timber trusses, Annecy lakehouse
SITTING AREA UNDER TIMBER TRUSSES

04 · Site diary

Work in progress, straight from site.

Construction as it actually happens: formwork, framing, fit-off and the hours between the finished photos. This is what working with us looks like in real life.

CURRENTLY UNDERWAY · VAUCLUSE

Stephen pointing out steelwork to operations manager Rufus on site at Vaucluse
STEPHEN & RUFUS ON SITE
Living room with white structural steel V-columns, Vaucluse build
STEEL & GLASS LIVING

ON THE TOOLS

Rooftop decking install, Tillow Built work in progress
ROOFTOP DECKING INSTALL
Building a timber screen, Tillow Built work in progress
BUILDING A TIMBER SCREEN
On the table saw, Tillow Built work in progress
ON THE TABLE SAW
Interior carpentry, Tillow Built work in progress
INTERIOR CARPENTRY
Joinery detail, Tillow Built work in progress
JOINERY DETAIL

BUILD DIARY · THE BRONTE HOUSE

Stephen's build of the award-winning Bronte house, from excavation and formwork through to fit-off. Kept here as it was shot on site.

Bronte build diary frame 01, construction in progress
Bronte build diary frame 02, construction in progress
Bronte build diary frame 03, construction in progress
Bronte build diary frame 04, construction in progress
Bronte build diary frame 05, construction in progress
Bronte build diary frame 06, construction in progress
Bronte build diary frame 07, construction in progress
Bronte build diary frame 08, construction in progress
Bronte build diary frame 09, construction in progress
Bronte build diary frame 10, construction in progress
Bronte build diary frame 11, construction in progress
Bronte build diary frame 12, construction in progress
Bronte build diary frame 13, construction in progress
Bronte build diary frame 14, construction in progress
Bronte build diary frame 15, construction in progress
Bronte build diary frame 16, construction in progress
Bronte build diary frame 17, construction in progress
Bronte build diary frame 18, construction in progress
Bronte build diary frame 19, construction in progress
Bronte build diary frame 20, construction in progress
Bronte build diary frame 21, construction in progress
Bronte build diary frame 22, construction in progress
Bronte build diary frame 23, construction in progress
Bronte build diary frame 24, construction in progress
Bronte build diary frame 25, construction in progress
Bronte build diary frame 26, construction in progress
Bronte build diary frame 27, construction in progress
Bronte build diary frame 28, construction in progress
Bronte build diary frame 29, construction in progress
Bronte build diary frame 30, construction in progress
Bronte build diary frame 31, construction in progress
Bronte build diary frame 32, construction in progress
Bronte build diary frame 33, construction in progress
Bronte build diary frame 34, construction in progress
Bronte build diary frame 35, construction in progress
Bronte build diary frame 36, construction in progress
Bronte build diary frame 37, construction in progress
Bronte build diary frame 38, construction in progress
Bronte build diary frame 39, construction in progress
Bronte build diary frame 40, construction in progress
Bronte build diary frame 41, construction in progress
Bronte build diary frame 42, construction in progress
Bronte build diary frame 43, construction in progress
Bronte build diary frame 44, construction in progress
Bronte build diary frame 45, construction in progress
Bronte build diary frame 46, construction in progress
Bronte build diary frame 47, construction in progress
Bronte build diary frame 48, construction in progress
Bronte build diary frame 49, construction in progress
Bronte build diary frame 50, construction in progress
Bronte build diary frame 51, construction in progress
Bronte build diary frame 52, construction in progress
Bronte build diary frame 53, construction in progress
Bronte build diary frame 54, construction in progress
Bronte build diary frame 55, construction in progress
Bronte build diary frame 56, construction in progress
Bronte build diary frame 57, construction in progress
Bronte build diary frame 58, construction in progress
Bronte build diary frame 59, construction in progress
Bronte build diary frame 60, construction in progress
Bronte build diary frame 61, construction in progress
Bronte build diary frame 62, construction in progress
Bronte build diary frame 63, construction in progress
Bronte build diary frame 64, construction in progress
Bronte build diary frame 65, construction in progress
Bronte build diary frame 66, construction in progress
Bronte build diary frame 67, construction in progress
Bronte build diary frame 68, construction in progress
Bronte build diary frame 69, construction in progress
Bronte build diary frame 70, construction in progress
Bronte build diary frame 71, construction in progress
Bronte build diary frame 72, construction in progress
Bronte build diary frame 73, construction in progress

Your project could be the next entry.

Book a free site visit →
📞 Call 0437 477 855